Quote-Ready Now Licensed & Insured
House Framing in Toronto, Ontario, framed on site by Timberr Framing
Framing in Toronto

House Framing in Toronto

House framing in Toronto and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Toronto framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6744
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from house framing in Toronto

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How a job runs, step by step

  1. Review the permit set. We read the architectural and structural drawings, the engineer's details and the permit conditions, and list open questions before material is ordered.
  2. Set the sill and floor system. Sill plates, beams, posts and joists go on the foundation per the plan, with bearing checked before the subfloor.
  3. Frame the walls. Wall panels or stick-built walls, with doubled studs at openings, headers per the drawings and braces or sheathing for racking.
  4. Add upper floors. Floor joists and subfloor, then the upper walls, tied to the lower storey as drawn.
  5. Frame the roof. Trusses or stick-framed rafters, per the plan, with bracing and bearing checked. See stick-built versus truss roofs.
  6. Sheathe and wrap. Wall and roof sheathing go on to the fastening schedule, then the weather barrier.
  7. Rough-ins and inspection. Plumbing, electrical and HVAC rough in while the frame is open. Toronto inspects the structural framing and fire separations before the walls are closed.
House Framing in Toronto being framed on site by Timberr Framing

Ready to price house framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6744
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

House Framing in Toronto

Understanding house framing

How Toronto reviews a house permit

How Toronto reviews a house permit

Toronto sorts building permit applications into review streams. Its House Stream covers a detached house, a semi-detached house or a row house containing not more than two dwelling units. Also includes garden suites and laneway suites. Toronto says complete applications are reviewed within 10 business days. A complete application includes an issued Zoning Applicable Law Certificate and confirmation that all applicable law has been satisfied; Toronto treats applications without a certificate as incomplete and sets no time frame for reviewing them.

A frame cannot start until the permit is issued, so the framing schedule really starts with that certificate. If you are early in the process, our analysis of new house permits in Toronto shows how permits are issued over the year.

Engineering on the drawings

Engineering on the drawings

Many house drawings carry engineered content, such as a steel beam or an engineered floor. Toronto relies on a professional engineer's seal in its expedited review and requires an Assumption of Responsibility for Engineering Content (AREC) form, signed by the designing engineer, for each application that carries sealed drawings. If the Building Code requires general review, a Commitment to General Review form must also be submitted. We frame to the permit set, so the engineer's details are what we build.

Trees on the lot

Trees on the lot

Toronto requires a permit for activity that could injure or remove a private tree of 30 cm or more in diameter. It also says that if construction work on site, including access or storage, will affect a tree's protection zone, you need to apply for a permit. That an as-of-right development that affects a protected tree still needs one. Before we stage lumber, we ask where the protected trees are, so a lumber stack or a delivery route does not become a violation.

What the Ontario Building Code asks of the frame

What the Ontario Building Code asks of the frame

Under Part 9 of the Ontario Building Code (O. Reg. 332/12), wall studs are continuous for the full storey height except at openings (9.23.10.4). Studs are doubled on each side of an opening, with the inner studs running from the lintel to the bottom plate (9.23.10.6). Exterior corners are framed with at least the equivalent of two studs (9.23.10.5). Each exterior wall in each storey is braced with a diagonal brace unless the interior finish or the sheathing takes that role (9.23.10.2).

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6744
Completed House Framing in Toronto, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

House Framing FAQ

Does a new house in Toronto need a building permit?

Yes. Toronto says a permit is required for the construction of a new building. Complete applications in the House Stream are reviewed within 10 business days, and a complete application includes an issued Zoning Applicable Law Certificate.

What counts as a house in Toronto's permit process?

A detached house, a semi-detached house or a row house with not more than two dwelling units. Garden suites and laneway suites are also reviewed in the House Stream.

Who engineers the frame?

The designer or engineer on the permit set. Toronto relies on a professional engineer's seal in its expedited review and requires an AREC form signed by the designing engineer. We frame to the engineered details.

Do trees affect the framing schedule?

They can. Toronto requires a permit for work that could injure or remove a private tree of 30 cm or more, including construction access or storage within the tree's protection zone.

What does Toronto inspect during framing?

Structural framing, fire separations and, later, insulation and the vapour barrier. Toronto lists framing at completion including plumbing and HVAC rough-in, fire separations before interior finishes, and insulation and vapour barrier before interior services.

What limits apply to cutting studs and joists?

Notching and drilling are limited by the Code. Load-bearing studs must keep at least two thirds of their depth (9.23.5.3), holes in joists may not exceed a quarter of the depth (9.23.5.1), and notches are limited to a third of the depth (9.23.5.2).

What should I send for a framing quote?

The address, drawings, permit status and target start. Include the structural details, beam and truss schedules and any site photos that show access.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6744
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a house framing quote in Toronto

Send the address, the permit drawings, the permit status and your target start. We will price the frame to the set and name what still needs a decision.

(416) 236-6744

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6744

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call