Quote-Ready Now Licensed & Insured
Framing Guide

New Detached and Semi Houses in Toronto, 2017 to 2025

Our analysis of City of Toronto permit data counts 8,686 new detached and semi-detached house permits issued from 2017 to 2025 and shows the busiest months.

New Detached and Semi Houses in Toronto, 2017 to 2025, framing work completed by Timberr Framing in the GTA

Our analysis of City of Toronto building permit data counts 8,686 original permits for new detached and semi-detached houses issued from 2017 to 2025. The yearly total fell from 1,398 in 2017 to 486 in 2025, and about 74 per cent were issued between March and October.

If you are planning a new house on a Toronto lot, those numbers tell you when the framing trade is busiest and how the pace of new building has changed. Our custom home framing crews plan around exactly this seasonal rhythm, and the sections below show it in the data.

How many new houses did Toronto permit each year?

The count fell in most years, from 1,398 permits in 2017 to 486 in 2025, a drop of about 65 per cent. The table splits each year into detached and semi-detached houses.

New detached and semi-detached house permits issued in Toronto by year, 2017 to 2025. Source: our analysis of City of Toronto building permit data, downloaded 4 November 2026.
Year issuedDetachedSemi-detachedTotal
20171,2551431,398
20181,280801,360
20191,011511,062
202079394887
202193553988
202292941970
202381366879
202463323656
202545729486
All nine years8,1065808,686

The three years from 2017 to 2019 together had 3,820 permits. The three years from 2023 to 2025 had 2,021, or about 53 per cent of that earlier total. Only 2021 was higher than the year before it.

We do not claim to know why. The data records permits, not the reasons people applied for them, and we did not test any explanation.

How much of the total is semi-detached?

Semi-detached houses are a small share and a shrinking one. They made up 580 of the 8,686 permits, or 6.7 per cent. In 2017 to 2019 the share was 7.2 per cent (274 of 3,820), and in 2023 to 2025 it was 5.8 per cent (118 of 2,021).

For a framer, that means most new houses permitted in the city are freestanding, with four exterior walls to build, brace and sheathe, not a shared party wall to detail. Party-wall work belongs to a different set of jobs, which we cover under low-rise residential framing.

Which months are busiest?

Timberr Framing crews framing on site in the Greater Toronto Area

Permits are issued all year, but they cluster in the warm months. October was the busiest month across the nine years with 959 permits, followed by June with 889 and May with 833. The quietest months were February with 514, December with 540 and January with 552.

Between March and October the City issued 6,394 of the 8,686 permits (about 74 per cent). November to February had 2,292. Eight months are being compared with four, so the fairer comparison is the monthly average. The four winter months averaged 573 permits each, while June had 889 and October had 959.

For a homeowner, this suggests a practical timing point. Framing crews are in demand when permits cluster and the ground is workable, so asking for a framing slot early, once the drawings are close to final, gives you more options. Our notes on framing in winter in Ontario cover what changes when the work does not start until the cold months.

Do the permits concentrate in particular parts of the city?

Yes, a little. We grouped permits by the first three characters of the postal code, which is a neighbourhood-sized area. There were 87 areas with a permit in 2017 to 2019 and 82 in 2023 to 2025, so new houses are spread widely.

The two busiest areas in 2017 to 2019 were M2N with 249 permits and M5M with 163. In 2023 to 2025 they were level at 121 each, which made them the top two again. Each area held roughly 6 per cent of the permits that had a postal code in the later period. No other area reached 4 per cent.

Some permits have no postal code at all: 204 in 2017 to 2019 and 52 in 2023 to 2025. We left those out of the area comparison but kept them in the yearly counts.

Does the permit date tell you when framing starts?

Not directly. The data gives the date the City issued the permit. After that comes excavation, the foundation, any waterproofing and backfill, and only then does the first floor deck go on. On a typical lot that means the frame arrives weeks or months after the permit date, and the gap depends on the site, the weather and the owner’s schedule.

So treat the monthly pattern as a signal about when the whole trade chain is busy, not as a calendar for your own job. Excavators, concrete crews, framers and truss suppliers all feel the same seasonal pull. Our guide on how long it takes to frame a house explains the framing stage itself once the foundation is ready.

What does this mean for your own project?

Timberr Framing crews framing on site in the Greater Toronto Area

Three points stand out for anyone planning a new house in Toronto.

  • Start the framing conversation before the permit is issued. Crews book against the season, and the data shows permit issue clustering from spring to autumn.
  • Know that the permit comes first. Under the Building Code Act, a permit is required to construct a new building, as the City of Toronto’s building permit guidance explains. Framing does not start on permit drawings that are still under review.
  • Have the right documents ready. A firm framing quote needs the drawings, the structural package, the foundation status and the roof or truss layout. Our framing contractor team asks for those up front, and our Toronto framing page covers what we check on a Toronto lot.

If your plan is a smaller second dwelling in the back yard rather than a main house, the volume and the rules differ, and our guide to laneway and garden suite framing in Toronto is the better start. For a whole-house frame from sill plate to roof, see custom home framing in Toronto.

How we counted

We used the City of Toronto’s Building Permits - Active Permits and Building Permits - Cleared Permits data sets, both downloaded on 4 November 2026. We combined the two tables because a permit moves from active to cleared as the work completes, and 285 New Houses permit numbers appear in both tables.

  • Permit type: New Houses.
  • Structure type: SFD - Detached or SFD - Semi-Detached. Townhouses, stacked townhouses and buildings with two or more units were excluded.
  • Period: issued date from 1 January 2017 to 31 December 2025, whole years only. 2026 is not complete, so it is not shown.
  • One count per permit: each permit number was counted once. Revision records (revision number above 00) were excluded so a change to the plans does not count as a new house.
  • Status: permits that were cancelled, refused, abandoned, or pending revocation or cancellation were excluded.
  • Checked twice: every number was computed with two separate methods and the results matched exactly.
  • Limits: the data records what the City issued, not what was built. Dates are as of the download and the City updates the data daily, so later downloads may differ slightly. A small number of permits have no postal code. We used only counts, with no names, addresses or permit numbers, and no cost fields.

Contains information licensed under the Open Government Licence (Toronto).

If you are planning a new house and want to talk through the frame, start with our custom home framing page.

If you are about to frame one of these houses, see house framing in Toronto.

Frequently asked questions

How many new detached and semi-detached house permits did Toronto issue from 2017 to 2025?

Our analysis of City of Toronto building permit data counts 8,686 original permits for new detached and semi-detached houses issued in those nine years. The yearly total fell from 1,398 in 2017 to 486 in 2025.

Which months does Toronto issue the most new house permits?

Across 2017 to 2025, October had the most with 959 permits and June followed with 889. January, February and December each had fewer than 560. About 74 per cent of the permits were issued between March and October.

Does this count townhouses, laneway suites or multiplexes?

No. We counted only permits whose structure type is detached or semi-detached house under the City's New Houses permit type. Townhouses, stacked townhouses and buildings with several units are separate structure types and are left out.

Does a permit issued in a given year mean the frame went up that year?

Not exactly. The date is when the City issued the permit, and framing usually starts after excavation and the foundation are done. A permit can also be issued and then not used for some time, so the permit date is a signal of demand, not a build date.

What should a homeowner have ready before asking a framer to quote a new house?

Have the permit drawings or the near-final set, the structural drawings with beam and post schedules, the roof or truss layout and the foundation status. A framer can only give a firm schedule once those are in hand.

← All framing guides

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call Get a Quote