Six-Storey Wood Frame Buildings in Ontario: Code and Framing

Ontario allows sprinklered six-storey wood frame apartments and offices. See the height and area limits, fire ratings, cladding rules and what framers build.

Six-Storey Wood Frame Buildings in Ontario: Code and Framing, framing work completed by Timberr Framing in the GTA

Yes, Ontario allows wood frame buildings up to six storeys for residential and business use. The building must be sprinklered throughout, no more than 18 m high, and within an area limit set by its storey count. The frame can be the main structure, but the engineering and fire ratings are far stricter than for a house.

This guide explains what the code actually says, what a framing crew builds on a mid-rise job, and what to have ready before you talk to a contractor. If you are planning a larger multi-unit or commercial build, our framing contractor team can review a permit set and define a framing scope. We also handle commercial framing for business and mixed-use buildings.

What does the Ontario Building Code allow for six-storey wood buildings?

Ontario’s code permits combustible construction (wood) for Group C residential and Group D business buildings up to six storeys when specific conditions are met. The text below comes from Ontario Regulation 332/12, the Building Code as it read until the end of 2024, on e-Laws.

For a Group C building, other than a retirement home, the conditions are:

  • The building is sprinklered throughout.
  • It is not more than six storeys in building height.
  • Its height is not more than 18 m, measured between the first storey floor and the floor of the uppermost storey.
  • Its building area stays within the limit for its number of storeys.

For Group D (offices and similar business use) the same height and storey limits apply, with a larger area allowance. The area limits are a function of storey count, because taller buildings get smaller floor plates.

StoreysGroup C maximum building areaGroup D maximum building area
19,000 m218,000 m2
24,500 m29,000 m2
33,000 m26,000 m2
42,250 m24,500 m2
51,800 m23,600 m2
61,500 m23,000 m2

These limits describe the framing envelope your design team works inside. They are not a promise that any site can reach them, because zoning, setbacks and fire access shape the building first.

Which edition of the code applies today?

The Ontario Building Code was reissued as O. Reg. 163/24, which adopts the National Building Code of Canada 2020 with Ontario amendments and took effect on January 1, 2025. The older regulation was revoked on that date, but it continues to apply to construction that already had a permit, or that had substantially complete drawings and applied for a permit before March 31, 2025, so long as work starts within six months of the permit being issued.

Article numbers changed with the reissue. In the older regulation the Group C six-storey provision was numbered 3.2.2.43A and the Group D provision 3.2.2.50A. The figures in this guide are from that earlier text, so treat them as a guide to the structure of the rules and confirm the exact article and values in the edition named on your permit.

What fire ratings does the frame have to meet?

Timberr Framing crews framing on site in the Greater Toronto Area

The frame is a fire-rated structure. Under the older regulation the combustible-construction articles required:

  • Floor assemblies that are fire separations with a fire-resistance rating of not less than 1 h.
  • Roof assemblies with a rating of not less than 1 h.
  • Mezzanines with a rating of not less than 1 h.
  • Load-bearing walls, columns and arches rated at least as high as the assembly they support.

Floors entirely inside a multi-storey dwelling unit still need a 1 h rating but do not have to be built as fire separations. Rated assemblies are tested systems, so the stud size, spacing, board layers and fasteners all come from the listing named on the drawings. Our guide to fire and sound separation in demising walls shows how those assemblies are built in smaller multi-unit work.

What are the roof and cladding rules?

Two details catch first-time mid-rise builders. The first is the roof: where the roof assembly is higher than 25 m above the first storey floor, it must be noncombustible or built of fire-retardant treated wood. The second is cladding. Under O. Reg. 89/23, which amended the code in May 2023, at least 90 per cent of the exterior cladding on each exterior wall of these buildings must be noncombustible, or the wall must be an assembly that meets the fire test criteria in the code.

Where fire-retardant treated wood is used as cladding in a tested assembly, it has to be tested for fire exposure after accelerated weathering to ASTM D2898. Cladding choices should be settled with the design team before the frame is priced.

Where do the other uses and parking go?

A few other occupancies can sit inside a combustible six-storey building, with limits on where. Under the older regulation, assembly (Group A, Division 2) and mercantile (Group E) uses had to be below the third storey, and storage garages below the fourth storey. That is one reason many projects put retail and amenity space at grade and parking below.

What does a framing crew actually build?

Timberr Framing crews framing on site in the Greater Toronto Area

A framer on a mid-rise wood job works from stamped structural and architectural drawings, not from a standard house plan. The work typically includes:

  • Load-bearing wall panels, floor systems and roof structures, fastened to the schedules on the drawings.
  • Shaft walls and rated corridor and suite separations.
  • Openings, headers and engineered members called out by the structural engineer.
  • Backing and blocking for finishes, rails, cabinets and fixtures, all planned ahead of drywall.

On taller wood buildings the quality of the lumber matters too. Our overview of framing lumber grades and species explains what the grade stamps mean, and the metal stud vs wood framing comparison covers where light-gauge steel is used inside a wood building, such as non-load-bearing partitions.

Because wood dries and shrinks over time, design teams account for movement through the stack of floors. The details are engineered, not improvised on site, so framers follow the drawings exactly and flag conflicts early.

How is the schedule different from a house?

A mid-rise frame is built floor by floor, and each floor depends on the one below being inspected and signed off. That means sequencing is part of the framing scope: crane time, material staging, panel delivery order and the point at which the building official or the engineer of record needs to see the work before it is covered. Our guide to how long it takes to frame a house explains the variables on smaller builds, and the same ones apply here at larger scale: weather, access, drawing changes and trade overlap. Ask any contractor how they handle open framing in rain and snow, because exposed wood needs a plan.

How do firewalls and party walls fit in?

A wood building often has to be divided into fire compartments or separated from a neighbouring building. Those separations have their own continuity rules, and the framing around them matters. Read our page on firewall and party-wall framing for how those walls are framed and supported.

What should you have ready before calling a framer?

Timberr Framing crews framing on site in the Greater Toronto Area

A framing contractor can only price a mid-rise job from real documents. Have these ready:

  1. The permit set or the latest issued-for-pricing drawings, including structural sheets.
  2. The code edition and article references the design team is using.
  3. The sprinkler strategy and the fire-rated assembly listings.
  4. The cladding and roof design intent, since they change the frame details.
  5. The site access plan, crane position and laydown area.
  6. The construction schedule and any weather protection requirements.
  7. Who is responsible for fire stopping, insulation and drywall, so scopes do not overlap.

Real numbers come from a review of your drawings, so we do not quote budgets from a phone call. Send the set and we will tell you what is in the frame and what is not.

If your project is a smaller stacked or multi-unit build, start with our overview of multiplex framing in Ontario.

Ready to talk through a mid-rise or multi-unit wood frame? Visit our framing contractor page to get started.

Frequently asked questions

Can you build a six-storey wood frame building in Ontario?

Yes. The Ontario Building Code permits combustible construction up to six storeys for residential (Group C) and office or business (Group D) buildings, provided the building is sprinklered throughout and stays within the height and area limits. A building permit is required.

How tall can a six-storey wood frame building be in Ontario?

Under the previous code, O. Reg. 332/12, the height from the first storey floor to the uppermost floor could not exceed 18 m. The storey count cap is six. Confirm the limit in the edition of the code that applies to your permit.

Does a six-storey wood building need steel or concrete anywhere?

Often yes, for practical reasons. Parking levels and podiums are commonly concrete, and the code requires roofs higher than 25 m to be noncombustible or built of fire-retardant treated wood. Your design team decides what goes where.

Can the exterior of a six-storey wood building be wood siding?

Not as a general rule. At least 90 per cent of the cladding on each exterior wall must be noncombustible, or the wall assembly must pass the fire test criteria the code sets. Fire-retardant treated wood cladding must be tested after accelerated weathering.

What does a framing contractor do on a mid-rise wood building?

A framer builds the structural wood frame to the stamped drawings: load-bearing walls, floor and roof assemblies, shafts, openings, backing and the fire-rated separations. Rated assemblies, fastening schedules and inspection holds all come from the drawings and the building official.

Which version of the Ontario Building Code applies to my project?

The 2024 Building Code (O. Reg. 163/24) has applied since January 1, 2025, with a transition rule that lets projects permitted or substantially designed before that date continue under the older regulation. Your permit documents name the edition.

← All framing guides

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing crews framing on site in the Greater Toronto Area

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call Get a Quote