I Joist vs Floor Truss: Which Floor System Fits Your Build

An I joist vs floor truss for an Ontario build: how each spans, handles ducts and holes, what the Building Code says, and what to settle before you order.

I Joist vs Floor Truss: Which Floor System Fits Your Build, framing work completed by Timberr Framing in the GTA

An I joist is a light engineered floor joist with a solid OSB web, and a floor truss is an open web frame built for one specific floor. In Ontario, choose I joists for simple layouts and changes made on site, and floor trusses for long spans, heavy ductwork and plans that are fixed before ordering. Both beat dimension lumber for flatness.

The right choice is usually clear once you know the span, where the ducts and drains run, and how likely the plan is to change. This guide walks through each point the way we do it on a floor and joist system job, with the Ontario Building Code rules and the manufacturers' own limits behind every number.

How does an I joist differ from a floor truss?

An I joist has two solid wood flanges joined by a thin OSB web, so the whole member is one continuous profile that you can trim to length on site. A floor truss has a top chord and a bottom chord joined by web members in a triangulated pattern, and it is manufactured for a specific layout, with its bearing points, depth and spacing fixed on the shop drawing.

That one difference explains most of the trade offs. An I joist is a stock product that suits changing plans. A floor truss is a custom product that suits plans that are settled.

How far can you span with a floor truss, and with an I joist?

The Ontario Building Code does not publish span tables for either product, so the span comes from the manufacturer's tables or the truss designer's drawing. Article 9.23.4.2 of the Code says spans for floor joists that are not selected from its Tables 9.23.4.2.-A and 9.23.4.2.-B must not exceed the design requirements for uniform loading and vibration criteria, and that is the rule these products are designed to.

For a sense of scale, Table 9.23.4.2.-A of the Ontario Building Code gives a 38 by 235 mm (nominal 2x10) Spruce-Pine-Fir No. 1 and No. 2 floor joist at 400 mm spacing a maximum span of 3.96 m in its strapping case. Engineered products are chosen when the room is longer than that.

  • I joists: each series has its own span table by depth and spacing. Deeper I joists reach further at the same spacing.
  • Floor trusses: the designer picks the depth, which can be much deeper than any I joist, so they can clear longer rooms. One Canadian open web truss maker's design guide shows its tables for depths from 14 to 40 inches, so depth is the main lever on span.

Span is only half the check. A floor that passes on strength can still feel bouncy, which is why the same Canadian open web truss design guide flags, cell by cell, whether a truss meets Canadian vibration criteria. It states that thicker sheathing, closer spacing or an attached ceiling may improve vibration performance. Ask for the vibration check, not only the strength check.

What are the disadvantages of I-joists?

Timberr Framing crews framing on site in the Greater Toronto Area

Where a web hole or a cut goes is the main limit. A Canadian engineered wood association's I-joist construction details guide says the top and bottom flanges must never be cut, notched or otherwise modified.

The same guide sets the rules for web holes:

  • The largest hole equals the clear distance between the flanges minus 1/4 inch, and at least 1/8 inch must remain between the hole and the flange.
  • Where there is more than one hole, the gap between hole edges must exceed twice the diameter of the largest round hole.
  • The guide limits a span to 3 maximum size holes.
  • Prescored knockouts are not counted as holes.

Compare that with solid lumber. Ontario Building Code Article 9.23.5.1 allows a hole in a sawn floor joist of up to one quarter of its depth, at least 50 mm from the edges. Sawn lumber is more forgiving of a drill. An I joist is not, and a misplaced hole needs a written repair detail from the manufacturer or an engineer.

Other limits to plan for:

  • Load paths: a post or load bearing wall above must be carried down through the floor with squash blocks or blocking panels, as the construction details guide shows, because the thin web cannot take a concentrated load.
  • Cantilevers: they need specific details, and the guide cautions that cantilevers must be detailed to prevent moisture getting in and decaying untreated I joist extensions.

What are the disadvantages of floor trusses?

A floor truss has to be right before it is ordered. Because it is made for one plan, a change to a bearing wall, a stair opening or a duct run after the order means going back to the designer. On site, its members cannot be cut or drilled to suit what the plumber needs.

The Code states the principle for roof trusses in Article 9.23.5.5: truss members shall not be notched, drilled or otherwise weakened unless the truss design allows for it. Treat a floor truss the same way. If a duct or a drain does not fit the planned openings, the truss designer approves the fix in writing before anyone cuts.

The other trade offs are practical:

  • Lead time: trusses are built to order, so allow for design, approval and manufacture before the framing date.
  • Bearing: trusses are designed for their exact supports, so a bearing wall that moves can make them unusable.

Is an I joist stronger than a 2x10?

Compare span tables, not depth. A 2x10 follows the Ontario Building Code span tables, and an I joist follows its manufacturer's table for its series. At the same depth, an I joist is built to span further and to stay straighter than lumber that shrinks as it dries.

The bigger difference is behaviour over time. Sawn lumber moves as the house is heated for the first winter, which shows up as nail pops and squeaks. We cover that, and how to reduce it, in our floor framing guide for Ontario. If the room is longer than the code table allows for a 2x10, move up to an engineered product rather than a bigger sawn member. Our floor joist span calculator shows where the sawn lumber limit lies for a given spacing.

Which one works better around ducts, drains and wiring?

Timberr Framing crews framing on site in the Greater Toronto Area

Floor trusses have the advantage for ducts, because round or rectangular ducts and drains pass straight through the open webs without any cutting, as long as they fit the openings on the drawing. I joists can take smaller pipes and wires through knockouts or field cut holes within the chart, but a large duct will not fit, because the largest hole is the clear web depth between the flanges minus 1/4 inch.

If the plan has a main trunk duct, several drains or a long bathroom run under the floor, that is the strongest argument for trusses. Where the mechanical runs are light, I joists are simpler. Either way, the plumber and the mechanical contractor need to see the floor drawing before the order, not after. A floor that hides services in a bulkhead can also use our soffit and bulkhead framing approach instead.

I joist vs floor truss: side by side

I joist and floor truss compared for an Ontario floor. Sources: Ontario Building Code 2024 (Part 9), a Canadian engineered wood association's I-joist guide and a Canadian open web truss design guide.
QuestionI joistFloor truss
Made forAny plan, trimmed on siteOne plan, fixed on the drawing
Span limit set bySeries, depth and spacing tablesDesigner's drawing for the plan
Cutting on siteWeb holes within the chart, flanges neverNone without written designer approval
Large ductsLimited by web depthPass through the open webs
Changes after orderingUsually manageableBack to the designer
Best suited toSimple layouts, additions, plans still movingLong spans, heavy ductwork, settled plans

How do you decide between them?

Start with the plan and the span, then work down this list.

  1. Is the plan final? If walls, stairs or ducts may still move, choose I joists.
  2. Is the span long? If the room is longer than a deep I joist can reach, or the depth must be limited, ask the truss designer for a quote.
  3. Are there large ducts or several drains? That favours trusses.
  4. Is it a renovation or addition? Existing walls often do not land where a truss needs bearing, so I joists, or a beam designed as part of a structural beam installation, are the usual route.
  5. What does the building department want? Ask whether the permit needs a stamped drawing for the floor system.

For a new custom home with an open plan, a mix is common: trusses where the long span and the mechanical runs are, and I joists elsewhere. A subfloor that is glued and screwed to either one makes the floor stiffer and quieter, and our subfloor and sheathing page explains what we install over each.

We also explain how these products compare with beams and other engineered members in our guide to engineered lumber.

What to have ready before you call

Timberr Framing crews framing on site in the Greater Toronto Area
  • A floor plan showing every wall above and below the floor, with the bearing walls marked.
  • The longest clear span in each room, measured between bearing faces.
  • Where the main duct, stacks and any bathroom or kitchen runs will go.
  • Stair, chimney and mechanical openings, with sizes.
  • The finish floor planned, since tile and stone need a stiffer floor.
  • Whether the plan could still change before framing.

Next step

If you are choosing between an I joist and a floor truss, see our floor and joist systems page or send us the plan and we will tell you which system fits it.

Frequently asked questions

What are the disadvantages of I-joists?

I-joists cannot be cut freely. The flanges must never be cut or notched, and web holes are limited by the manufacturer's hole chart, so a wrongly placed hole needs a written repair detail. They also need blocking panels and squash blocks where loads come down through the floor, and they usually carry a shallower depth limit than a deep floor truss.

Is an I joist stronger than a 2x10?

It depends on the product, so compare span tables rather than depth alone. A 2x10 is limited by Table 9.23.4.2.-A of the Ontario Building Code, while an I-joist is limited by the manufacturer's tables for its series, depth and spacing. At the same depth, an I-joist is built to span further and to stay straighter as it dries, but only the tables for your product and loads give the real answer.

How far can you span with a floor truss?

There is no single figure. A floor truss span depends on its depth, its spacing, the floor load and the vibration criteria it must meet, and the truss designer states it for your plan. Manufacturers publish tables by depth, and the truss is designed for a specific floor, so the span you can use is the one on the signed truss drawing.

Can I move a wall or add a bulkhead after floor trusses are ordered?

Not safely without the truss designer. A floor truss is designed for its exact bearing points, and its web members cannot be cut, drilled or moved on site. Settle wall positions, stair openings, ducts and plumbing before the truss order is placed, because a change afterwards means a redesign or a written repair detail.

Do I need an engineer for an I joist or floor truss floor in Ontario?

Spans that are not taken from the Ontario Building Code tables must meet the Code's design requirements for uniform loading and vibration. In practice, floor trusses arrive with a designer's drawing for your plan, and I-joist floors are sized from the manufacturer's published tables. Your building department may also ask for a stamped drawing for heavy loads, long spans or openings, so ask which it wants before you order.

← All framing guides

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call Get a Quote